It's bonus points for spec'ing things like that.
Don't forget to spec an APC 3000 for the UPS & include references to software that may have been used in the reasoning (more points). A ESXi backup program is a must (saves a rebuild, then seperate restores).
Also include the carepack/4hr response, training, rails, labour (@ £700 a day, 5 days min), consultancy fees (@ £700 a day for designing it), the program you'll be using to virtualize the existing machines and and shortfalls of the plan (include a 2nd hotswap server for redundancy).
Probably best to also discuss why it's not better to virtualize 2 servers such as these to one server as it's actually cost more than replacing all 3 servers.